300 kW On-Grid Solar System Installation at Quaid-e-Azam Industrial Estate, Lahore

Client: Hassan Plastic Molding Pvt. Ltd.
Location: Quaid-e-Azam Industrial Estate Lahore
Scope Of Work: 300kw Ongrid Solar System Installation
Completed Date: 2025-09-22

Project Details

300 kW on-grid system for Hassan Plastic Molding Pvt. Ltd. in Quaid-e-Azam Industrial Estate, Lahore. A plastics moulding plant with continuous daytime load. The brief was a large on-grid system with a green meter so that generation offsets production cost directly and surplus is exported.

What we installed

  • 300 kW on-grid industrial system
  • High-efficiency PV modules with on-grid inverters
  • Green meter installed for export

Performance

  • Daily generation: ~1,200 units
  • Monthly generation: ~36,000 units
  • Annual generation: ~438,000 units
  • Carbon offset: about 55.5 tonnes per year

Figures are the system’s design output; actual production varies with season and shading.

What this means under 2026 net billing

A business that runs during the day consumes most of what the roof produces as it is generated, so the value of this system comes from self-consumption at the full tariff rather than from exports. That is why the February 2026 move from net metering to net billing, which cut the export rate to about Rs 11 per unit, barely changes the return on a well-sized commercial or industrial system. Surplus outside working hours still earns the export rate. Read our guide to net metering versus net billing in Pakistan.

Location

This installation is in Quaid-e-Azam Industrial Estate, Lahore. See our Industrial solar in Lahore page for more local projects and typical system sizes, or check the Solar system prices by size at SNM’s published rates.