10kw Hybrid Solar System Installation at Chakwal

Client: Mr. Zubair
Location: Chakwal
Scope Of Work: 10kw Hybrid Solar System Installation
Completed Date: 2025-12-26

Project Details

10 kW hybrid system in Chakwal. We are proud to announce the successful installation of a 10kW Hybrid Solar Power System at a cement factory near District Chakwal, delivering reliable, intelligent, and sustainable energy tailored for industrial operations.

What we installed

  • 10kW Fronus Solar Panels
  • 2 × 6kW Fronus Hybrid Inverters
  • 10kWh Tubular Battery Backup
  • Net Metering Enabled

Performance

  • Daily Production: 42 kWh
  • Monthly Production: 1,260 kWh
  • Annual Production: 15,330 kWh
  • Annual Carbon Reduction: 1.85 Tons

Figures are the system’s design output as recorded at commissioning; actual production varies with season and shading.

What this means under 2026 net billing

The battery is what makes this design hold up under net billing, in force for new connections since 9 February 2026: daytime surplus is stored and used in the evening at the full tariff of roughly Rs 55 to 65, instead of being exported at about Rs 11. Backup through load-shedding is the reason most homes buy the battery, so it sits outside the solar payback, which at our current rates is 2 to 3 years. Connections approved under net metering before that date keep their original terms. Read our guide to net metering versus net billing in Pakistan.

Location

This installation is in Chakwal. SNM installs across Pakistan; see system prices by size, or check the 10 kW system price at SNM’s published rates.

Planning something similar?

Call or WhatsApp 0321 878 3630 for a free site survey and an itemised quote. All system prices · Solar prices in Lahore